ferpi.eu

  

  • About Us
  • Expertise
    • Mining
      • Works in Progress
      • Completed Projects
    • Earthworks
      • Works in Progress
      • Completed Projects
    • Civil & Industrial Works
      • Works in Progress
      • Completed Projects
    • Underground Works
      • Completed Projects
    • Drilling and Blasting
    • Sustainability
      • Completed Projects
  • Equipment
    • Machinery
    • 3D Surveying
  • Safety
    • Integrated Policy
    • ISO 14001
    • ISO 9001
    • OHSAS 18001
  • Contacts
    • Careers
  • 4
  • 4

Sustainability - Most important Projects Completed

CLOSING AND SEALING OF THE LA ROBLA LANDFILL PROJECT (SPAIN)

SEALING OF URBAN WASTES LANDFILL FOR THE MUNICIPALITY OF LA ROBLA, LEÓN (SPAIN) – YEAR 2006

Main Project Units:

14.500 m2 Deratization surface
14.500 m2 Blown debris collection
50.133 m3 Soil or wastes excavation, loading and hauling to the landfill
28.051 m3 Embakment, formation and compacting of soil or wastes
14.319 m2 (100 gr/m2) Geotextile sheet supply and fiting
31.250 m2 (200 gr/m2) Geotextile sheet supply and fiting
16.887 m2 2 mm HDPE sheet supply and fiting
17.614 m2 (200 gr/m2) Geotextile sheet supply and fiting

Developed Projects: 800.000

PIPELINE LINEAR PROJECTS RESTITUTION (SPAIN)

LAND AND FOREST RESTITUTION FOR PIPELINE LINEAR PROJECTS (SPAIN)

Main Project Units:

Vegetation Coverage Restitution
Reforestation
Boundaries Resitution
Trail Restitution
Road Restitution
Closing walls Restitution
Soil Excavation
Passages Signalling
Tree Planting
Irrigation ditches

CLOSING AND SEALING OF THE VEGA DE ESPINAREDA URBAN WASTES PROJECT (SPAIN)

CLOSING AND SEALING OF THE VEGA DE ESPINAREDA URBAN WASTES PROJECT,LEÓN (SPAIN) – Year 2007

Main Project Units:

12.000 m2 Deratization surface
2.000 m2 Blown debris collection
24.307 m3 Land excavation
1.600 m3 Embakment, formation and compacting of selected soils
1.982 m3 Embakment, formation and compacting of low permeability soils
8.551 m3 Formation of embakment with excavation soils
36.091 m3 Loading and hauling of urban wastes to the landfill
1.690 m3 Filtering material (aggregate) drenage formation
15.756 m3 Loading and hauling to the landfill
12.571 m2 HDPE sheet supply and fiting

Developed Projects: 750.000?

CLOSING AND SEALING OF THE VILLAESTRIEGO DEL PÁRAMO URBAN WASTES PROJECT (SPAIN)

CLOSING AND SEALING OF THE VILLAESTRIEGO DEL PÁRAMO URBAN WASTES, LEÓN (SPAIN) – Year 2004

Main Project Units:

20.051 m3 Filling, formation and compacting of soil or excavations residues
14.500 m2 Deratization surface
4.5000 m2 Blown debris collection
50.133 m3 Soil or wastes excavation, loading and hauling to the landfill
28.051 m3 Embakment, formation and compacting of soil or excavations residues
14.319 m2 Polypropylene geotextile sheet supply and fiting (100 gr/m2)
36.091 m3 Loading and hauling of urban wastes to the landfill
31.250 m2 HDPE sheet supply and fiting, 2 mm thick
31.250 m2 Polypropylene geotextile sheet supply and fiting (200 gr/m2)

Developed Projects: 550.000

RECOVERY OF THE PEREDA MINE (SPAIN)

RECOVERY OF THE TRASPEÑA-CUBILLO OPEN CAST MINE (SPAIN)

RECOVERY OF THE VALURCIA OPEN CAST MINE (SPAIN)

RECOVERY OF THE GRAN CORTA DE FABERO - (SPAIN)

MUÑECA DE LA PEÑA FIRST EXPANSION (SPAIN)

MUÑECA DE LA PEÑA SECOND EXPANSION (SPAIN)

SESTIL (SPAIN)

PROJECT OF A “NON-HAZARDOUS WASTE” LANDFILL RESTORATION AND CLOSURE, LEON (SPAIN)

PROJECT OF A “NON-HAZARDOUS WASTE” LANDFILL RESTORATION AND CLOSURE, LEON (SPAIN)

Client: DRAGADOS - UNIÓN FENOSA.

Year: 2010

RESTAURACIÓN DE LA EXPLOTACIÓN MINERA A CIELO ABIERTO “BUSEIRO” TINEO -ASTURIAS (SPAIN)

RECOVERY OF THE “BUSEIRO” OPEN CAST MINING OPERATION, TINEO-ASTURIAS (SPAIN)

Client: GONZÁLEZ Y DÍEZ, S.A.

Year: 2009



Ferpi en el Mundo

Cookies panel | Legal Notice | Cookies Policy | Privacy Policy